Step 4 Connect signal cables. Bind cables to the cabinet nearby.
●
●
●
● Do not bind signal cables and power cables together.
● RS485 cables and FE cables must be shielded cables.
● The figure uses the cable connection between the UPS and the SmartLi as an
Issue 03 (2021-08-03)
Figure 6-62 Installing cables
(1) Equipotential ground
If you need to log in to the WebUI of the UPS monitoring system, connect the
network port on a PC to the FE port on the monitoring interface card.
If the UPS needs to connect to an external network management device,
connect the external network management device to the RS485 port on the
monitoring interface card.
If the UPS needs to connect to the SmartLi, connect the COM port on the
monitoring interface unit in the master SmartLi cabinet to the COM2 port on
the monitoring interface card.