UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Modules)
6.3.1.2 Installing Cables
Context
Procedure
Step 1 Open the front door of the cabinet, remove the power distribution cover, and
remove the top cover as required.
Figure 6-17 Removing the covers
Step 2 Install ground cables.
Issue 03 (2021-08-03)
NO TE
The number and colors of cables in the figures are for reference only.
Copyright © Huawei Technologies Co., Ltd.
6 Installation
85