Single Ups Commissioning; Powering On And Starting The Ups; Powering On The Ups - Huawei UPS5000-H User Manual

400 kva-800 kva. 100 kva power modules
Hide thumbs Also See for UPS5000-H:
Table of Contents

Advertisement

UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Modules)

7.1 Powering On and Starting the UPS

Prerequisites
Measure the voltage and frequency of the external input switch of the UPS. The
voltage range is as follows:
Frequency range: 40–70 Hz

7.1.1 Powering On the UPS

Context
Procedure
Step 1 Turn on the upstream bypass and mains input switches.
After the UPS is powered on, initialization begins. The MDU displays the Huawei
logo and an initialization progress bar.
----End
Issue 03 (2021-08-03)
7

Single UPS Commissioning

138–260 V AC (line voltage) in the 200 V AC/208 V AC/210 V AC voltage
system
138–485 V AC (line voltage) in the 380 V AC/400 V AC/415 V AC voltage
system
192–528 V AC (line voltage) in the 480 V AC voltage system
The following operations are applicable to a single UPS. For parallel systems,
contact Huawei technical support.
Before power-on, ensure that the devices have passed all check items in the
section "Verifying the Installation."
Before power-on, ensure that all the UPS switches and upstream switches are
OFF.
Copyright © Huawei Technologies Co., Ltd.
7 Single UPS Commissioning
149