UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Modules)
Figure 6-86 Hole positions on the channel steel (optional)
(1) Hole positions on the channel steel (The figure uses the C-shaped channel steel with the
opening facing downwards and one cabinet as an example. The figure shows the hole positions
on the channel steel when the cabinet is not installed against a wall. The channel steel model,
installation mode, whether holes need to be drilled on its sides, hole size, and the actual
number of cabinets are determined based on site survey data.)
Figure 6-87 Recommended channel steel dimensions (unit: mm)
6.4.3.2 Installing Cables
Procedure
Step 1 Install cables. For details, see
----End
6.4.4 Installing the UPS + Bottom Cabling Cabinet + Top
Outlet Kit
●
●
Issue 03 (2021-08-03)
If both the bottom cabling cabinet and the top outlet kit are configured,
cabinets can be installed against a wall and cables can be routed from the
bottom.
The following procedure applies to installation against a wall. If cabinets are
not installed against a wall and there is operation space at the rear of the
cabinets, you need to install the cabinet combination screws at the rear and
the anchor screws at the bottom.
Copyright © Huawei Technologies Co., Ltd.
6.4.1.2 Installing
Cables.
6 Installation