6.3.2 Installing the UPS + Bottom Cabling Cabinet

6.3.2.1 Installing Cabinets

Installation on the Floor
Ensure that the installation floor is level.
Step 1 Determine the cabinet installation positions on the floor based on the holes in the
marking-off template for floor installation.
Issue 03 (2021-08-03)
NO TICE
NO TE
● A: mounting holes on the channel steel
● B: mounting holes on the floor