6.11 Verifying the Installation

Table 6-12
You need to carefully check items 08 and 09 listed in
results of these two items do not meet the acceptance criteria, the UPS may be
damaged.
Table 6-12 Check items and acceptance criteria
No.
01
Issue 03 (2021-08-03)
NO TE
● When you use the NC status, remove the jumper between EPO_NC and EPO_12V first.
When you turn off the EPO switch, EPO is triggered.
● When you use the NO status, ensure that the jumper is connected between EPO_NC and
EPO_12V. When you turn on the EPO switch, EPO is triggered.
lists check items and acceptance criteria.
NO TICE
Item
Cabinet installation
Copyright © Huawei Technologies Co., Ltd.
Table
6-12. If the check
Acceptance Criteria
The cabinets are securely installed and
do not tilt due to vibration.