If the No battery alarm is generated, after you turn on the battery switches, the
alarm is cleared automatically within 2 minutes.
Step 14 Check that no alarm is generated for any UPS, and start the new UPS in inverter
mode. The parallel system transfers to inverter mode. View the system running
diagram to check that the system is working in inverter mode.
----End

8.7 Commissioning a Dual-Bus System

Context
The dual-bus system consists of one master and one slave BSC system. You can
specify one master and one slave BSC system (UPSs in the same system cannot be
set to both master and slave BSC systems) during initial startup, and change the
settings under the guidance of maintenance engineers when needed. Set the BSC
master and slave systems to master and slave modes respectively.
Procedure
Step 1 Connect BSC cables.
Figure 8-2 Parallel cable connections in a dual-bus parallel system
Issue 03 (2021-08-03)
Copyright © Huawei Technologies Co., Ltd.
8 Parallel System Commissioning
188

Advertisement

Table of Contents
loading

Table of Contents