Downloading The Test Data - Huawei UPS5000-H User Manual

400 kva-800 kva. 100 kva power modules
Hide thumbs Also See for UPS5000-H:
Table of Contents

Advertisement

UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Modules)
Figure 7-17 Starting a group capacity test
----End

7.6.3 Downloading the Test Data

Procedure
Step 1 On the WebUI, choose Query > Battery Test Records, choose logs that need to be
queried from the Log drop-down list box, and click Query.
Figure 7-18 Battery Test Records
Step 2 Choose logs that have been queried from the Log drop-down list box, and click
Export.
----End
Issue 03 (2021-08-03)
NO TE
The group capacity test automatically stops in any of the following cases:
● The minimum cell voltage reaches 2.75 V.
● The load fluctuation exceeds 20%.
● An alarm is generated.
The test is complete when the minimum cell voltage reaches 2.75 V. The test data is
obtained from the group capacity test. Save the test data obtained from the latest 36 tests.
Copyright © Huawei Technologies Co., Ltd.
7 Single UPS Commissioning
168

Advertisement

Table of Contents
loading

Table of Contents