GE 90-30 PLC Series Installation And Hardware Manual page 442

Hide thumbs Also See for 90-30 PLC Series:
Table of Contents

Advertisement

Index
IC693CSE311 baseplate
IC693CSE313
IC693CSE313 baseplate
IC693CSE323
IC693CSE323 baseplate
IC693CSE331
IC693CSE340
IC693DSM302
IC693DSM314
IC693DVM300
IC693GCM301
IC693PCM300/301/311
IC693PRG300
IC693PTM100/101
IC693PWR321
IC693PWR322
IC693PWR328
IC693PWR330
IC693PWR331
IC693SLP300
IC693TCM302
IC693TCM302/303
Illustration of the DSM302 Module, 8-18
Illustration of the DSM314 Module, 8-21
Indicator lights
Index-8
Series 90™-30 PLC Installation and Hardware Manual – August 2002
Data sheet, 9-14
drawing, 9-9
Data sheet, 9-15
drawing, 9-9
Data sheet, 9-16
drawing, 9-9
Data sheet, 9-17
drawing, 9-10
State Logic CPU, 9-10
Data sheet, 9-18
drawing, 9-10
State Logic CPU, 9-10
Digital Servo Module, 8-17
module drawing, 8-17
Digital Servo Module, 8-20
module drawing, 8-20
connections, 7-14
module drawing, 7-12
specifications table, 7-13
valve driver module, 7-12
Genius Comm. Module, 8-2
Prog. Coprocessor, 8-31
Hand-Held Programmer, 11-5
Power Transducer, 8-40
power supply, 4-2
power supply, 4-7
power supply, 4-10
power supply, 4-4
power supply, 4-13
module drawing, 9-4
Temperature Contol Module, 8-37
module drawing, 8-37
relating to I/O terminals, 13-1
see LED indicators also, 13-2
Inspection, new system, 2-1
Installation
32-Point modules, 2-20
baseplate adapter bracket, 2-8, 3-20
baseplate, model 311/313, 3-16
baseplate, model 323, 3-17
Basic procedure, 2-28
grounding procedures, 2-11
I/O expansion system, 10-31
load requirements for components, 12-12
multidrop configuration, 10-9
pcm to programmer cables, 10-13, 10-15, 10-17
remote expansion system, 3-15, 10-31
Installing, I/O Module Term Board, 2-5
Instructions for floating neutral (IT) systems,
2-25
Internet
GE site, 13-9
Interposing terminal blocks, 2-19, H-2, H-12
Isolated Repeater/Conv.
overview (obsolete), 11-8
Isolated repeater/converter, 11-4
cable diagrams, C-8
complex multidrop configuration, C-6
description of, C-1
illustration of, C-2
logic diagram, C-3
pin assignments, C-4
rules for using, C-7
simple multidrop configuration, C-6
system configurations, C-5
J
Jumper strap for overvoltage protection
devices, 4-6, 4-17
Jumpers for EPROM/EEPROM selection, 5-8
Jumpers, converter board, B-7
configuration of, B-8
K
Key, CPU
replacement, 5-16, 13-7
Keyswitch
CPU, 5-15
Kits, spare parts, mechanical, 13-7
L
Layout PLC system
good layout benefits, 12-17
Layout, PLC
figure, 12-20
GFK-0356Q

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents