Huawei NetCol5000-C Series User Manual page 102

In-row chilled water smart cooling product
Hide thumbs Also See for NetCol5000-C Series:
Table of Contents

Advertisement

NetCol5000-C(065, 080) In-row Chilled Water Smart
Cooling Product
User Manual
After you power on the smart cooling product for the first time, the screen displays the
Wizard Startup. You can select to commission the smart cooling product or not. If you select
to commission it at other times, choose Maint > Wizard Startup to start commissioning.
Tapping No or Exit, submission timeout, and system exception all result in commissioning
failures. Choose Maint > Wizard Startup to enter the Wizard Startup screen for new
commissioning.
Procedure
Step 1 On the home screen, choose Maint > Wizard Startup, as shown in
Figure 4-24 Startup wizard
Step 2 Tap Yes. The checking before startup screen is displayed, as shown in
Issue 07 (2020-03-16)
For the initial startup wizard, Last record is in grey, indicating that the operation is not allowed.
For the non-initial startup wizard, choose Last record and you can view the last startup wizard
report.
Copyright © Huawei Technologies Co., Ltd.
4 Commissioning
Figure
4-24.
Figure
4-25.
94

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netcol5000-c065Netcol5000-c080

Table of Contents