Cop Port (J6) Pin Assignments; Jtag Port (J7) Pin Assignments; Table 3-10 Cop Port (J20) Pin Assignments; Table 3-11 Jtag Port (J7) Pin Assignments - GE C2K Hardware Reference Manual

Table of Contents

Advertisement

3.2.4 COP Port (J6) Pin Assignments

The C2K includes an on-board 2 x 10-pin COP Port header (J6) for stepping through code at the
MPC7448 processor. The VDD_SENSE signal is fixed at +2.5V. Table 3-10 shows the COP Port
pin assignments.
NOTE: A jumper must be installed on the COP_EN header/jumper (P10) to enable the J6 inter-
face (see "COP_EN (P10)" on page 2-3).
COP Port (J20) pin assignments
Table 3-10
Pin
Assignment
1
COP_TDO
3
COP_TDI
5
RUN_STOP#
7
COP_TCK
9
COP_TMS
11
COP_SRESET#
13
COP_HRESET#
15
CKSTP_OUT#
17
n/c
19
n/c
* This pin may be pulled to ground by the COP adapter cable
to automatically enable the COP port instead of installing a
jumper on COP_EN header P10.

3.2.5 JTAG Port (J7) Pin Assignments

The C2K includes an onboard 2 x 5-socket JTAG header (J7) for FPGA programming and JTAG
Boundary Scan Chain.
JTAG Port (J7) pin assignments
Table 3-11
Pin
Assignment
1
TDO
3
TCK
5
GND
7
TRST#
9
FLASH_BUSY#
C2K User's Guide
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Pin
Assignment
2
COP_QACK#
4
COP_TRST#
6
VDD_SENSE
8
COP_CKSTP_IN#
10
n/c
12
GND
14
KEY
16
GND
18
n/c
20
n/c *
Pin
Assignment
2
+3.3V (Vref)
4
TMS
6
GND
8
TDI
10
FLASH_WE#
Interfaces
3-14

Advertisement

Table of Contents
loading

Table of Contents