Stage
Tools: marker, ink fountain, long leather measuring tape, crane, socket wrench,
torque wrench, Phillips screwdriver, jack, steel hoisting rope, level, level gauge,
hammer drill, angle ruler, claw hammer, vacuum cleaner
Materials: equipment to be hoisted, expansion bolt, angle steel bracket, and shock
absorption pad
Table 4-5 Recommended specifications of shock absorption pads
Item
Material
Flame spread rating
Thickness
Color
Dimensions
Procedure
Step 1 Prepare a concrete platform by referring to the following figures.
Figure 4-3 Concrete platform for separate installation (unit: mm)
Issue 04 (2022-06-30)
Precautions
Remove the steel ropes after ensuring that the equipment is
placed evenly on the concrete platforms.
Copyright © Huawei Technologies Co., Ltd.
4 System Installation
Specifications
EPDM
V0
15 mm
Black
210 mm x 210 mm