Commissioning The Pdu2000 (For Fusionmodule800) - Huawei ECC800-Pro User Manual

Data center controller
Hide thumbs Also See for ECC800-Pro:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual (for ECC800-Pro)
Step 4 If there are multiple eLights, repeat
----End
5.8 Commissioning the PDU2000 (for
FusionModule800)
When the system type is FusionModule800 and a PDU2000 is installed, perform
the following steps to configure it.
Prerequisites
One end of the straight-through cable has been connected to the COM port on
the PDU2000 and the other end has been connected to the COM port on the ETH
converter.
Context
Table 5-12 PDU2000 basic Information
Vendor
Clever
Haipengxin
a: The barcode starts with 21 and is attached to the device.
Procedure
Step 1 Set the PDU2000 monitoring parameters.
Issue 02 (2020-09-07)
Item
NOTE
After you set the alarm severity, the eLight indicator is off if no alarm is generated.
Set the PDU2000-M (C) monitoring parameters.
Copyright © Huawei Technologies Co., Ltd.
Alarm Severity
Selection
Critical, Major,
Minor, Warning
None
Step 1–Step
Name
Displayed on
the WebUI
PDU2000-M(C)
PDU2000-M(H)
5 Power-On Commissioning
Description
NOTE
– Critical: red light
– Major: orange light
– Minor: yellow light
– Warning: white light
The eLight strip light is steady
blue (atmosphere light).
3.
Eleventh and Twelfth
Characters in Device
Barcode
a
FT
6B
120

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents