Configuring Pue User-Defined Mode - Huawei ECC800-Pro User Manual

Data center controller
Hide thumbs Also See for ECC800-Pro:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual (for ECC800-Pro)
3.
4.

6.8.2 Configuring PUE User-defined Mode

Context
This section describes how to configure PUE for the integrated PDU connected.
The functions of configuration buttons for the PUE user-defined mode are
described as follows.
Table 6-42 PUE configuration buttons
No.
1
2
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > PUE Configuration.
Step 3 Set PUE function to Enable.
Step 4 Set PUE configuration mode to User-defined, and click Submit.
1.
Issue 02 (2020-09-07)
Set Device to ECC800, Performance data to Total electrical energy of
system IT load output, and Statistics mode to Hour, set other query criteria
such as Start time and End time as required, and click Query. Record the
increment in total electrical energy of system IT load output of the ECC800-
Pro. Increment in total electrical energy of system IT load output = 56.0 kWh
– 50.0 kWh = 6.0 kWh.
Figure 6-63 Querying the total electrical energy of system IT load output
Calculate the PUE of the smart module. PUE = Increment in total system input
electrical energy/Increment in total electrical energy of system IT load output
= 10.0 kWh/6.0 kWh = 1.67.
Button
Description
Add
Adds new total power consumption or IT power consumption
parameters.
Delete
Deletes a parameter setting for the total power consumption
or IT power consumption.
On the Total Power Consumption Configuration tab page, click Add to
enter the Total Power Consumption Configuration page. On the Select
Device tab page, select Integrated PDU 1. On the Select Indicators tab
page, select Total active electricity energy of PDU input, and click Confirm.
Copyright © Huawei Technologies Co., Ltd.
6 Feature Description
208