Scheduling a Response to an Event of Interest

Document 800-07769 Rev A
02/11
Updating a Name or Type of a Holiday/Exception
1.
Select the holiday/exception to be updated from the list (see
2.
Change the Type or Name fields, as needed. Click Update.
Correcting the Date of a Holiday/Exception
1.
Select the holiday/exception with the faulty date from the list (see
the Date field, as needed.
2.
Click Add. This adds a new holiday/exception with the correct date and the same
name. The old item with the faulty date remains on the list.
3.
Select the holiday/exception with the faulty date. Click Delete.
The Response schedule is used to make simple cause and effect rules, to program how a
Multi-Media unit responds to events of interest. For example,
Trigger: = If camera 1 senses motion...
Response: = ... then the unit responds with Event Recording on camera 1...
Schedule: = ... however, event recording should not occur outside of business
hours. Event Recording will only occur on weekdays, during business hours (between
7 am and 7 pm).
Figure 7-6
Rule with a Trigger, Response, and Schedule
Rapid Eye DVR System Administrator Guide
Figure
Figure 7-6
7-5).
7-5). Change
Figure
shows:
121