Notes On Holidays And Exceptions; Adding Holidays And Exceptions; Figure 7-5 Specifying Holidays And Exceptions - Honeywell Rapid Eye System Administration Manual

Hide thumbs Also See for Rapid Eye:
Table of Contents

Advertisement

Enhancing Video

Notes on Holidays and Exceptions

Adding Holidays and Exceptions

120
The dates of holidays and exceptions can be input by your organization's Multi SA, or
by operators who have the right to run a
The dates added to the Holiday/Exception list become part of every schedule.
Settings for Holidays and Exceptions have higher priority than settings for the other
days of the week. For example, if you set weekdays to not trigger alarms but Holidays
are set to trigger alarms, the result would be that alarms are raised on holidays, even
when that holiday falls on a weekday.
1.
Continue or start a
Maintenance Session
2.
Click the Schedules tab.
3.
Select Holiday/Exception (see
exception) in the Name field.
4.
Choose whether to list the day as a holiday or an exception by selecting the option
with the Type drop-down arrow.
Figure 7-5
Specifying Holidays and Exceptions
5.
Ensure that the Date you enter is unused and in the future. To enter a date, either:
Enter a date. In the Date box, select the part of the date that you want to change.
Use the arrow keys (on your keyboard to change the number, or enter any
number that you want.
Use the calendar utility. Click the Date drop-down arrow to display the calendar
utility. Find and select the date that you need in the calendar. Click the arrow
keys at the top of the calendar to go to another month.
6.
Click Add. The date is added to the list (see
Note
Make duplicate holiday records for each year that the system will be in use.
Maintenance
Session.
for the Rapid Eye Multi-Media site.
7-5). Enter a name for the holiday (or
Figure
Figure
7-5).

Advertisement

Table of Contents
loading

Table of Contents