The station can operate from either an electrical power source or by using
batteries. The batteries will provide automatic backup power if the main
power fails.
1.
Connect the power cord to the POWER port on the station and then
plug the cord into an AC outlet. Or install the batteries. Refer to Battery
Installation.
2.
Connect the charger cord to the CHARGER port on the station and then
plug the cord into an AC outlet (if applicable).
3.
Attach all gas connections. Inlet 1 (PURGE) is configured for ambient air and
inlets 2 - 5 are configured for calibration/test gases. Refer to
Inlet
Setup.
4.
A demand flow regulator must be used with all gas cylinder connections.
5.
Ensure the exhaust line is not connected to a negative pressure system.
For AC main installation, a circuit breaker must be integrated in the building
installation as a disconnect device for the station.
The disconnect device must be installed in close proximity to the station and must
be marked as a disconnecting method for the station.

Battery Installation

WArNINg
Only change batteries in an atmosphere that is clear of hazardous gas. Failure
to adhere to this warning can result in personal injury and/or property damage.
To install batteries into the station, refer to Figure 4 and complete the following:
1.
Loosen only; do not remove the retaining screws from the battery cover.
2.
Remove the battery cover and set it aside.
3.
Insert four C-cell batteries into the battery compartment.
4.
Replace the battery cover and tighten the retaining screws. Do not over
tighten the screws. Refer to
16
Table 11. Torque
MicroDock II Automatic Test and Calibration Station
Confirming
Specifications.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents