Pump Setup - Honeywell MicroDock II Operating Manual

Automatic test and calibration station
Table of Contents

Advertisement

Pump Setup

The pump speed must be set for each new docking module that is connected.
WArNINg
Perform the pump setup procedures in a clean atmosphere only.
11.
Reactivate the station and wait until the normal operating screen displays.
12.
Connect the hose to a flow meter and to inlet 1 (PURGE) on the station.
Allow the flow meter sufficient time to stabilize (approximately 30 minutes)
before using to ensure accurate flow readings.
13.
From the station, access the user options menu.
14.
Press
15.
Press
The station immediately begins pumping the ambient air.
The factory default pump speed displays beside Pump Setup. The station
pump setup is measured as a percentage (%) and the flow meter is
measured in ml/min.
NOTe
The station is shipped with the factory default pump speed set to 350
ml/min. (40-45%).
16.
Monitor the flow meter until the unit stabilizes (5-20 minutes depending
upon the type of flow meter).
17.
From the station, press
m.
18.
From the station, press
Pump Setup field (* changes to :).
19.
Press
20.
Repeat steps # 1-19 for each docking module that is added. Continue to
step #21 and 22 for the last module added.
21.
After all of the modules have been added, attach the end plate (refer to
Figure 9).
22.
Fasten the bottom cover plate to the space between the two docking modules
using six Philips flat-head screws (refer to Figure 10).
NOTe
When assembling or reassembling parts of the station and docking modules,
refer to the
22
or
^ to scroll to the Pump Setup option.
sel to activate the pump setup field (: changes to *).
exit again to return to the normal operating screen.
Table 11 Torque
or
^ until the flow meter displays 350 ml/
exit to save the new value and deactivate the
Specifications.
MicroDock II Automatic Test and Calibration Station

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents