Chapter 7
Building the Second Row Table Assembly
Before you attach the floating brackets, route the Ethernet and power cables in
Note
Power and Signal Cables."
After you attach the brackets with the shoulder screws, move the brackets left and right to ensure that
Note
they can move freely.
Figure 7-14
Floating Brackets, Type 1
7(1)
Attach the second set of floating brackets to the table assembly.
Step 15
Before you attach the floating brackets, route the power cables in
Note
Cables."
After you attach the brackets with the shoulder screws, move the brackets left and right to ensure that
Note
they can move freely.
OL-14521-01
3(6)
12
12 56
Chapter 9, "Routing Power and Signal
Cisco TelePresence System 3200
Parts List
Chapter 9, "Routing
6(8)
7-17