Starting Up Your Server; Overview; Turn On Power And Check Status; Check Lcnp4M Status - Honeywell PE SC1430 Planning, Installation And Service Manual

Table of Contents

Advertisement

Step
nuts and tighten the screws.
4
Attach the rear mounting bracket to the rear cabinet rail using two thread
forming screws and two external tooth washers and tighten the screws.
5
Attach the air duct baffle to the rear mounting bracket using two machine
screws and two external tooth washers threaded into the two self clinching
nuts. Tighten the screws.
2.7

Starting up your Server

Overview

The following table lists those tasks that must be performed prior to operating your
server platform. This section contains procedures for each of these tasks.
Note: Cabinet mounted servers that do not have a KVM switch/console require the
connection of the USB mouse and keyboard (supplied with the server) for server startup.

Turn on power and check status.

Check LCNP4M status.

Turn on power and check status
Step
1
Press the power button on the front panel.
2
Wait for the power light to become solid green.
If the power light does not become solid green, refer to the "Advanced
3
Troubleshooting" section of the Dell Precision™ PE SC1430 System User's
Guide.
Check LCNP4M status
If this is a TPS node with the LCNP4M board installed, verify that the LCNP4M passed
self test.
Step
1
From the Start menu, go to Programs>Honeywell TPS, select LCNP4M
Status.
2
Verify that the LCNP4M status indicates Passed Self Test and the circle is
green.
12/2007
PE SC1430-Based Honeywell Server PE SC1430-Based Honeywell Server
Release Independent
Action
Task
Action
Action
Honeywell
2. Platform Installation
2.7. Starting up your Server
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents