5. If necessary, refer to the section
6. To complete the installation, turn on the server.
3.5
Starting the server
Turning on the power
l
3.5.1
Turning on the power
To turn on the server
1. Press the power button on the front panel of the server.
2. Wait for the power light to become solid green.
Install air duct baffles and blank panel front covers in
ATTENTION
Any unused rack mount space must have an air duct baffle and blank front panel
installed.
ATTENTION
If the power light does not become solid green, refer to the Troubleshooting section in
the Dell™ PowerEdge™ T130 Systems Owner's Manual.
- 27 -
Chapter 3 - Installation
cabinet.