Starting The Server; Turning On The Power - Honeywell T320 Planning, Installation And Service Manual

Table of Contents

Advertisement

2. Place the blank front panel across the front of the cabinet rails. Attach it to the air duct baffle and
right cabinet rail using two machine screws and two external tooth washers threaded into the two
clip nuts, and then tighten the screws.
3. Attach the other side of the blank front panel to the left cabinet rail using two machine screws and
two external tooth washers threaded into the two clip nuts and tighten the screws.
4. Attach the rear mounting bracket to the rear cabinet rail using two thread forming screws and two
external tooth washers and tighten the screws.
5. Attach the air duct baffle to the rear mounting bracket using two machine screws and two external
tooth washers threaded into the two self clinching nuts. Tighten the screws.
3.5

Starting the server

Turning on the power

l
Configuring RAID in Dell T320 server
l
Starting the TDC emulator services
l
Checking the LCNP4e/LCNP4e2 status
l
3.5.1
Turning on the power
To turn on the server
1. Press the power button on the front panel of the server.
2. Wait for the power light to become solid green.
Figure 3.3 Secure Blank Panel Front Cover with Machine Screws
ATTENTION
If the power light does not become solid green, refer to the Troubleshooting section in
the Dell™ PowerEdge™ T320 Systems Owner's Manual.
- 40 -
Chapter 3 - Installation

Advertisement

Table of Contents
loading

Table of Contents