Honeywell PE SC1430 Planning, Installation And Service Manual page 48

Table of Contents

Advertisement

4. Platform Servicing
4.1. Servicing the PE SC1430-based Server
Step
Attention:
Because of the weight (41 lbs, 18.6 Kg) and length of the server two people
should perform this procedure.
3
Remove the server from the cabinet and lay the system on its side
(horizontal) on a secure surface.
If using the server as a tower unit, lay the system on its side (horizontal) on
a secure surface.
4
Locate the release cover tab on top of the system.
5
Slide the release cover tab toward the rear of the system to release the
cover.
48
PE SC1430-Based Honeywell Server PE SC1430-Based Honeywell Server
Action
Honeywell
12/2007
Release Independent

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents