Honeywell PE SC1430 Planning, Installation And Service Manual page 49

Table of Contents

Advertisement

Step
6
Lift the edge of the cover up.
7
Grasp the cover on both sides, and lift the cover off. Set the cover aside,
away from the system.
8
Press the release latch on the P3 power cable connector beside the power
supply and pull the connectors apart.
12/2007
PE SC1430-Based Honeywell Server PE SC1430-Based Honeywell Server
Release Independent
4.1. Servicing the PE SC1430-based Server
Action
Honeywell
4. Platform Servicing
49

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents