Introduction

Overview

This section contains procedures for installing and cabling the server as a tower unit or in
an 800mm deep equipment Honeywell cabinet, model number MP-C8LCB1 or 1000mm
deep equipment Honeywell cabinet, model number MP-C1MCB1.

Tasks for installing the server

The following table lists the major platform installation tasks.
Task
Be aware of all power and
grounding requirements for your
furniture.
Install tower unit
Install the server in the cabinet.
Start up the Server
If you are remotely connecting
the computer, connect the
remote components.

Before you begin

Before performing the procedures in this section, verify the following tasks have been
performed.
Verify the cabinet has been properly grounded.
Unpack the platform from the box and verify all parts are accounted for.
Use a #2 Philips head screwdriver.
Position the server on a secure surface near the cabinet it will be mounted in.
Identify and verify all necessary cables for your particular configuration are
available.
12/2007
PE SC1430-Based Honeywell Server PE SC1430-Based Honeywell Server
Release Independent

2. Platform Installation

Table 2-1 Server Installation Tasks

Specific site requirements
Section 2.2, Power and Grounding Requirements
TPN System Installation (SW20-600), Section 4,
System Grounding
Figure 2-1 for cable connections
or
Section 2.4, Installing the Server in a Cabinet
Section 2.7, Start up the Server
Remote Peripheral Systems Installation and
Upgrade (RE01)
Honeywell
For more information see . . .
Description
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents