3 PROFIBUS GATEWAY MODULE (PGM) PLANNING AND DESIGN
3.1 Review Experion system capabilities
Read the Overview document to understand the basic concepts and terminology, and appreciate the capabilities
of Experion.
Complement the information in this document with the data in the Server and Client Planning Guide to cover
all aspects of an Experion installation.
Refer to the Server and Client Planning Guide for planning and design topics for Experion servers and clients
as well as information about adding third-party controllers.
Refer to the Control Hardware Planning Guide for a general discussion of planning activities for Experion
control hardware that covers the following:
•
Initial planning and design
•
Control network considerations
•
Control hardware configuration
•
Site selection and planning
•
Control processing considerations
•
Application licensing considerations
Refer to the PROFIBUS Interface Implementation Guide to understand the basic concepts and terminologies of
PROFIBUS.
Refer to the CEAG Remote I/O Modules and Easy-COM LB8106/FB8206 Instruction Manual for more
information on the CEAG remote I/O modules.
20
www.honeywell.com