Bosch DCN Next Generation Installation And User Instructions Manual page 65

Digital congress network
Hide thumbs Also See for DCN Next Generation:
Table of Contents

Advertisement

DCN NG | Installation and User Instructions | Section 3 | Central Control Equipment
8.3.3
Connecting to the DCN
Connect the DCN trunk line to the DCN sockets of the
CCU using LBB4116/xx Extension Cables (see
figure 8.4). Each socket has a red LED that lights up to
indicate power overload situations. An overload
situation occurs when the equipment connected to the
sockets asks for more power than can be provided or
when a short-circuit is detected (see also section 26.5.4)
Overload
indicator
figure 8.4: Connecting to the DCN
Bosch Security Systems | 2004-03 | 9922 141 70521en
8.3.4
Connecting to the optical
network
Connect the optical network to the optical network
sockets using LBB4416/xx optical Network Cables.
Each socket has a red LED that lights up to indicate
power overload situations. An overload situation occurs
when the equipment connected to the sockets asks for
more power than can be provided (see also
section 27.4.4)
Overload
indicator
figure 8.5: Connecting to the optical network
en | 65

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents