Mitsubishi Electric GT11 User Manual page 326

Graphic operation terminal
Hide thumbs Also See for GT11:
Table of Contents

Advertisement

Installation method of CoreOS
2
16 - 12
16.5 CoreOS
16.5.1 Installation method of CoreOS
Write CoreOS from drawing software to the
1
CF card
For details on the operation method of
drawing software, refer to the following
manual.
GT Designer2 Version
Operation/Data Transfer Manual
GT Designer3 Version1 Screen
Design Manual (Fundamentals)
Check that the power of GOT main unit is
2
OFF, and then mount the CF card to GOT.
After mounting it, turn ON the CF card
access switch.
Turn ON the GOT power
3
After the power is turned on, CoreOS
installation execution screen is
automatically displayed after a brief
interval.
After the CF card access switch is turned
4
off, the installation of CoreOS is started.
Basic

Advertisement

Table of Contents
loading

This manual is also suitable for:

Got1000

Table of Contents