Huawei NetCol5000-A050 User Manual page 295

In-row air cooled smart cooling product
Hide thumbs Also See for NetCol5000-A050:
Table of Contents

Advertisement

NetCol5000-A050 In-row Air Cooled Smart Cooling
Product
User Manual
4.
5.
● If the main control board is not powered off, the main control board detects
and initializes the display module after the DP cable is connected to the display
module. This process takes 10s to 30s. Wait for 5s to 10s. The indicator on the
panel turns on, but the screen does not turn on. Wait for another 5s to 20s
until the screen is restored to the state before the replacement.
● If the main control board is powered off, power on the main control board after
the DP cable is connected to the display module. After the main control board
is powered on, the startup logo and self-check progress bar are displayed on
the LCD. The main screen is displayed. The whole restoration takes about 60s to
90s.
Step 3 (Optional) Import the configuration. If the WebUI or ECC is not configured, skip
this step.
1.
2.
----End
Issue 08 (2021-09-17)
Figure 11-42 Replacing a controller panel
Install the new controller panel in the original position on the front door in an
inverse order.
Connect the control signal cables to the controller panel. Close and lock the
front door.
CA UTION
Insert the USB flash drive into the main control board or main control
module. Go to Maint > USB Operations > Import Config as an admin user
to import the backup data in the USB flash drive.
Log in to the WebUI of the smart cooling product as an admin user. Choose
Maintenance > Configuration, and choose the backup data. (Optional) after
tapping Configuration File Encryption Password, tap Upload to import the
backup data from the computer.
Copyright © Huawei Technologies Co., Ltd.
11 Parts Replacement
285

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents