Power-On Commissioning; Vacuumizing And Precharging Refrigerant; Refrigerant Charge Amount - Huawei NetCol5000-A050 User Manual

In-row air cooled smart cooling product
Hide thumbs Also See for NetCol5000-A050:
Table of Contents

Advertisement

NetCol5000-A050 In-row Air Cooled Smart Cooling
Product
User Manual

6.1 Vacuumizing and Precharging Refrigerant

During the commissioning of the smart cooling product, ensure that no comburent
substance (such as air or additive) enters the smart cooling product system.
Huawei is not liable for any risks and losses caused due to violation.

6.1.1 Refrigerant Charge Amount

Table 6-1 Refrigerant charge amount
Refrigera
nt Charge
Amount
Standard
charge
amount
(kg)
Issue 08 (2021-09-17)
6

Power-On Commissioning

CA UTION
Length
NetCol500-
of the
A060
One-
(NetCol500-
Way
A120)
Connecti
on Pipe
Between
the
Indoor
and
Outdoor
Units (L)
≤ 10 m
9.2
Copyright © Huawei Technologies Co., Ltd.
6 Power-On Commissioning
NetCol500-
NetCo
A060 with
l500-
a Low
A080
Temperatur
e
Component
20.2
13.2
NetCol500-
W055
10
121

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents