After you power on the smart cooling product for the first time, the screen
displays the Wizard Startup screen. If the smart cooling product is not started for
the first time, choose Maint > Wizard Startup to enter the Wizard Startup
screen.
Tapping No or Exit, submission timeout, and system exception all result in
commissioning failures. Choose Maint > Wizard Startup to enter the Wizard
Startup screen for new commissioning.
Procedure
Step 1 On the home screen, choose Maint > Wizard Startup, as shown in
Figure 6-36 Wizard Startup
Step 2 Tap Yes. The checking before startup screen is displayed, as shown in
If the remaining refrigerant is not charged, tap No. Complete refrigerant charging,
and then perform the wizard commissioning.
Figure 6-37 Checking before startup
Issue 08 (2021-09-17)
NO TICE
NO TE
● For the initial wizard startup, Last Record is in gray, indicating that operation is not
allowed.
● For a non-initial wizard startup, you can choose Last Record to view the last wizard
startup report.
NO TICE
Copyright © Huawei Technologies Co., Ltd.
6 Power-On Commissioning
Figure
6-36.
Figure
6-37.
164

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents