Reference Documentation; Commissioning Personnel Skill Requirements - Huawei FusionModule1000A40 Commissioning Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A40:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide

4.2 Reference Documentation

Table 4-2 Required documentation
Item
Prefabricated
all-in-one data center
Integrated UPS
NetCol5000-A 25 kW
air cooled in-row
smart cooling product
NetCol5000-A 21 kW
air cooled in-row
smart cooling product
Outdoor unit
ECC800
NetEco

4.3 Commissioning Personnel Skill Requirements

Table 4-3 Skill requirements for the FusionModule1000 commissioning personnel
Field
Power supply and distribution
system
Cooling system
Issue 04 (2020-01-17)
Document Name
FusionModule1000A40 Prefabricated All-in-One Data Center
V200R003 Initial Configuration Parameter Manual
UPS5000-E-(50 kVA–125 kVA) User Manual (Integrated UPS
3.0)
UPS5000-E-(20 kVA–80 kVA) User Manual (Integrated UPS,
208 V)
NetCol5000-A 25 kW Air Cooled In-row Smart Cooling Product
User Manual (300 mm Width)
NetCol5000-A 21 kW Air Cooled In-row Smart Cooling Product
User Manual (208 V)
NetCol500 Variable Speed Outdoor Unit User Manual
ECC800 Data Center Controller V100R001C41 User Manual
ECC800 V100R001 Alarm Reference
iManager NetEco Product Documentation-(V600R007C90)
The ECC800/NetEco version depends on the version in use. Click
to obtain the current version.
Copyright © Huawei Technologies Co., Ltd.
4 Preparations for Power-On Commissioning
Personnel Skill Requirement
Familiar with the power supply and distribution system
configurations and the operations for each core device
in the FusionModule1000
With power distribution engineer qualifications
Familiar with the cooling system configurations and the
operations for each core device in the
FusionModule1000
With cooling engineer qualifications
on the ECC800/NetEco WebUI
18