FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
System
Check Item
Cooling
product
compressor
pads
Liquid level
detector
fastener
Cooling
product
teamwork and
signal cables
Cooling
product pipe
connection
Management
Component
system
installation and
connection
Fire
Device
extinguishing
installation and
system (CE)
cable
connections
Lighting
Component
system
installation and
connection
Issue 04 (2020-01-17)
Operation Method
Check the cooling product
compressor.
Check the liquid level detector
fastener.
Check the connection of cooling
product teamwork and signal
cables.
Check the pipe connections for
the air-cooled smart cooling
products.
Check the monitoring device
installation and connection.
Check the fire extinguishing
device installation and cable
connections.
Check the lighting device
installation and connection.
Copyright © Huawei Technologies Co., Ltd.
5 Check Before Power-On
Reference
All cooling product compressor pads
are removed.
The liquid level detector fastener has
been removed.
Cables are securely connected and
meet the design requirements.
The refrigerant circulation pipeline,
humidifier water refill pipeline, and
condensate drainpipe are properly
installed, and the thermal insulation
layers are intact.
Devices are installed securely as
shown in the monitoring device
layout diagram.
Cables are correctly connected.
The pressure pointer of the fire
cylinder is in the green zone.
The dowel of the fire cylinder is
properly installed and intact.
All cables are correctly and
securely connected.
Devices are installed in positions
shown in the lighting device layout
diagram.
Cables are correctly connected.
25