FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
Step 4 (Optional) If initial configurations are involved, verify that the initial parameter settings are
correct.
For details about initial configurations, see the initial configuration parameter manual for
the solution in use.
Initial configurations must be verified before the first power-on after installation or restart
after a long power-off period.
Equipment with initial configurations can be powered on only after the initial
configurations are verified.
----End
Issue 04 (2020-01-17)
Copyright © Huawei Technologies Co., Ltd.
6 Power-On Commissioning
29