Preparations For Power-On Commissioning; Tool Preparations - Huawei FusionModule1000A40 Commissioning Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A40:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide

4.1 Tool Preparations

Table 4-1
Table 4-1 Tools
Tools
Phillips screwdriver
Multimeter
Cable tie
ESD gloves
Issue 04 (2020-01-17)
4
Preparations for Power-On
lists the tools required for power-on commissioning.
Flat-head screwdriver
Electroprobe
Insulation tape
Step ladder (2 m)
Copyright © Huawei Technologies Co., Ltd.

4 Preparations for Power-On Commissioning

Commissioning
Utility knife
Network cable tester
Marker
ESD wrist strap