Table 6-1 Checking after power-on
System
Check Item
Power supply and
Integrated UPS
distribution system
Cooling system
Air cooled smart
cooling product
Management
Monitoring device
system
Issue 04 (2020-01-17)
Check Sub-item
MDU
Remote temperature and
humidity (T/H) sensor
Main control board
Controller
Camera
ECC800 collector
AI/DI module
Smart ETH gateway
AC actuator
Copyright © Huawei Technologies Co., Ltd.
6 Power-On Commissioning
Criteria
The screen is free from erratic
display or missing characters.
Settings meet the requirements
of the current scenario.
The mains and bypass input and
output voltage, power,
frequency, current, power
factor, electricity energy, and
switch status are properly
displayed.
There is no active alarm whose
severity is higher than minor. If
there are any alarms, record and
handle the alarms.
The indicators are on.
The DIP switch settings are the
same as the initial settings.
The DIP switch settings are the
same as the initial settings.
NOTE
The S1 toggle switch exists on the
Arm7 main control board, but does not
exist on the M4 main control board.
For the Arm7 main control board, you
need to set the toggle switch.
The screen is free from erratic
display or missing characters,
and displays no alarm.
The teamwork settings are the
same as the initial settings.
The red indicator inside the camera
is on.
The power indicator on the main
control board is on.
The indicator on the power
module is green.
The PWR and RUN indicators are
on.
The PWR and RUN indicators are
on.
The PWR, RUN, and RF_Z
indicators are on.