Preparations For Power-On Commissioning; Tools - Huawei FusionDC1000A Commissioning Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario)

3.1 Tools

The following table lists the tools required for power-on commissioning.
Table 3-1 Tools
Issue 02 (2022-12-15)
3
Preparations for Power-On
Phillips screwdriver
Multimeter
Cable tie
Copyright © Huawei Digital Power Technologies Co., Ltd.

3 Preparations for Power-On Commissioning

Commissioning
Tools
Flat-head screwdriver
Electroprobe
Insulation tape
Utility knife
Network cable tester
Marker
26