Cisco 6503 - Catalyst Firewall Security Sys Installation Manual page 307

Installation guide
Hide thumbs Also See for 6503 - Catalyst Firewall Security Sys:
Table of Contents

Advertisement

Chapter 4
Removal and Replacement Procedures
To install the ferrite bead on the remote power-cycling control wires, follow these steps:
Remove the ferrite bead and the two plastic ties from the plastic bag.
Step 1
Open the ferrite bead as shown in
Step 2
Place the two remote power-cycling control wires (18 AWG maximum) in the ferrite bead as shown in
Step 3
Figure
together and are secure.
Locate a point on the remote power-cycling control wires that leaves approximately 1 to 2 inches (2.5 to
Step 4
5 cm) of exposed wire from the remote power cycling terminal block located on the front of the power
supply. Wrap one of the 4-inch plastic ties around the remote power-cycling control wires at that point.
Tighten the plastic tie so that it is snug against the control wires and cannot slide. See
View C.
Slide the ferrite bead so that it is positioned just behind the first plastic tie wrap. Take the second plastic
Step 5
tie and wrap it around the control wires directly behind the ferrite bead and tighten it so that the ferrite
bead cannot slide up or down the control wires. See
To finish the procedure, trim the excess plastic strap from the two plastic tie wraps.
Step 6
Figure 4-79
View A
Ferrite bead open
View C
OL-5781-08
4-79, View B. Close the ferrite bead making sure that the two halves have completely snapped
Installing the Ferrite Bead
Tie wrap
Ferrite bead
Installing the Remote Power Cycling Feature Control Wires (Optional)
Figure
4-79, View A.
Figure
4-79, View C.
Approximately
1 to 2 inches (2.5 to 5 cm)
Tie wrap
Catalyst 6500 Series Switches Installation Guide
Figure
View B
To power supply remote
power on/off terminal block
4-79,
4-101

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6500 series

Table of Contents