Rack-Mounting The Chassis - Cisco 6503 - Catalyst Firewall Security Sys Installation Manual

Installation guide
Hide thumbs Also See for 6503 - Catalyst Firewall Security Sys:
Table of Contents

Advertisement

Chapter 3
Installing the Switch

Rack-Mounting the Chassis

Tip
We recommend that you have a third person to assist in this procedure.
For easier installation, the chassis should be empty when you install it in the rack.
Caution
Two people are required to lift the chassis. To prevent injury, keep your back straight and lift with your
Warning
legs, not your back. Statement 164
To install the switch chassis in the equipment rack, follow these steps:
With a person standing at each side of the chassis, grasp the chassis handle with one hand, and use the
Step 1
other hand near the back of the chassis for balance. Slowly lift the chassis in unison. Avoid sudden twists
or moves to prevent injury.
Step 2
Position the chassis in the rack as follows:
a.
b.
Locate the rack post holes that align with the chassis L bracket holes. If the rack post holes are
Step 3
prethreaded, determine if the threads are 10-32 or 12-24. If the rack post holes are unthreaded, install
eight or ten (four or five on each side) either 10-32 or 12-24 clip or cage nuts over the rack post holes to
accept the installation screws.
Note
If you want to install one or both of the optional cable guide assemblies, position the cable guides so that
Step 4
the cable guide mounting holes are aligned with rack-mount bracket holes and the rack post holes as
shown in
Step 5
Install a minimum of ten (five on each side) 10-32 or 12-24 screws through the cable guide mounting
holes, rack-mount L bracket holes, rack post holes, and into the clip nuts to secure the cable guides and
the chassis to the rack post. Tighten the screws securely. (See
Use a tape measure and level to verify that the chassis is installed straight and level.
Step 6
Note
If you are not rack-mounting the Catalyst 6513 or the Catalyst 6513-E switch and you are installing the
optional cable guide assemblies, you must obtain ten 12-24 or 10-32 nuts. Use the screws supplied in the
accessory kit and the nuts you obtained to attach the cable guide assembly to the L bracket.
OL-5781-08
If the front of the chassis (front panel) is at the front of the rack, insert the rear of the chassis between
the mounting posts, resting the chassis on the shelf brackets, and then carefully slide the chassis into
the rack.
If the rear of the chassis is at the front of the rack, insert the front of the chassis between the
mounting posts, resting the chassis on the shelf brackets, and then carefully slide the chassis into the
rack.
Clip nuts or cage nuts are not included as part of the accessory kit that comes with the chassis.
You must obtain them yourself.
Figure
3-24.
Installing a Catalyst 6513 or Catalyst 6513-E Switch Chassis
Figure
3-24.)
Catalyst 6500 Series Switches Installation Guide
3-45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6500 series

Table of Contents