Cisco 6503 - Catalyst Firewall Security Sys Installation Manual page 174

Installation guide
Hide thumbs Also See for 6503 - Catalyst Firewall Security Sys:
Table of Contents

Advertisement

Establishing the System Ground
Step 5
Place the grounding wire lug against the grounding pad, making sure that there is solid metal-to-metal
contact.
Note
Secure the grounding lug to the chassis with two M4 screws. Ensure that the grounding lug and the
Step 6
grounding wire will not interfere with other switch hardware or rack equipment.
Prepare the other end of the grounding wire, and connect it to an appropriate grounding point in your
Step 7
site to ensure adequate earth ground for the switch.
Figure 3-28
Catalyst 6500 Series Switches Installation Guide
3-54
There are two system grounding pads on the Catalyst 6509-NEB-A and the Catalyst 6509-V-E
switch chassis. One pad is located in the upper-left corner of the chassis, and the other is located
in the upper-right corner of the chassis. Additionally, both system grounding pads have 3 M4
screw holes so that the system grounding lug can be installed either horizontally or vertically.
System Ground Location (Catalyst 6503 and Catalyst 6503-E Chassis)
Grounding lug
WS-X6 K-SUP 2-2GE
CONSOL E
PORT
MODE
CONSOL E
SUPER VISOR 2
PCMCIA
EJECT
OSM-4OC 12 POS-SI
4 PORT OC-12 POS SM
IR
OSM-4OC 12 POS-SI
4 PORT OC-12 POS SM
IR
System ground
connector
Wire
System ground
connector
Switch
Load
100%
PORT 1
PORT 2
1%
Chapter 3
Installing the Switch
OL-5781-08

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6500 series

Table of Contents