Cisco 6503 - Catalyst Firewall Security Sys Installation Manual page 300

Installation guide
Hide thumbs Also See for 6503 - Catalyst Firewall Security Sys:
Table of Contents

Advertisement

Installing the Air Filter Assembly on a Catalyst 6509-NEB-A Switch or a Catalyst 6509-V-E (Optional)
Step 2
Install the new intake panel by tightening four thumbscrews. (See
Figure 4-74
1
Thumbscrews
2
Fastening screw
Remove the inner filter retainer from the filter cage assembly by depressing the thumb loops and
Step 3
carefully sliding filter retainer outwards. (See
Catalyst 6500 Series Switches Installation Guide
4-94
Installing the New Intake Panel
o
INPUT
FAN
OUTPU T
OK
OK
FAIL
Chapter 4
Removal and Replacement Procedures
Figure
1
3
o
INPUT
FAN
OUTPU T
OK
OK
FAIL
3
Support loop
Figure
4-75.)
4-74.)
2
OL-5781-08

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6500 series

Table of Contents