Installing The Fan Assembly; Checking The Installation - Cisco 6503 - Catalyst Firewall Security Sys Installation Manual

Installation guide
Hide thumbs Also See for 6503 - Catalyst Firewall Security Sys:
Table of Contents

Advertisement

Removing and Installing the Fan Tray

Installing the Fan Assembly

To install the new fan assembly, follow these steps:
Hold the fan assembly with the fans facing to the right and the FAN STATUS LED at the bottom.
Step 1
For the Catalyst 6509-NEB switch, hold the fan assembly with the fans facing down and the FAN
STATUS LED on the left. (See
switches, hold the fan assembly so that the handle is at the top of the assembly. (See
Step 2
Place the fan assembly into the front chassis cavity so that it rests on the chassis, and then lift the fan
assembly up slightly, aligning the top and bottom chassis guides.
Push the fan assembly into the chassis until the power connector seats in the backplane and the captive
Step 3
installation screws make contact with the chassis.
Tighten the captive installation screws.
Step 4
On the Catalyst 6509-NEB-A and the Catalyst 6509-V-E switches, fold the cable guide up, and tighten
Step 5
the two captive installation screws at the top of the chassis. (See

Checking the Installation

To verify that the new fan assembly is installed correctly, follow these steps:
Listen for the fans; you should immediately hear them operating. If you do not hear them, ensure that
Step 1
the fan assembly is inserted completely in the chassis and that the faceplate is flush with the switch back
panel.
Verify that the FAN STATUS LED is green. If the LED is red, one or more of the fans are faulty.
Step 2
Step 3
If after several attempts the fans do not operate or if you experience trouble with the installation (for
instance, if the captive installation screws do not align with the chassis holes), contact a Cisco customer
service representative for assistance.
Catalyst 6500 Series Switches Installation Guide
4-92
See
Figure 4-64
for the Catalyst 6503 and Catalyst 6503-E switches.
See
Figure 4-65
for the Catalyst 6504-E switch.
See
Figure 4-66
for the Catalyst 6506 and Catalyst 6506-E switches.
See
Figure 4-67
for the Catalyst 6509 and Catalyst 6509-E switches.
See
Figure 4-71
for the Catalyst 6513 switch.
See
Figure 4-72
for the Catalyst 6513-E switch
A fully populated Catalyst 6509-V-E cable management system can be very heavy. As you pivot the
cable guide back up after replacing the fan tray, you should gently rock the cable guide to allow the
network interface cables to align themselves. This makes it easier for you to position the cable guide
in front of the chassis so that the two captive installation screws can be engaged and tightened. Make
sure that the network interface cables are not caught or pinched in the cable guide.
After positioning and securing the Catalyst 6509-V-E cable guide, verify that the tab at the back of
the cable guide front panel is still engaged in the slot on the back of the cable guide next to the
chassis. If the tab has popped loose, you must reinstall the tab in the slot.
Figure
4-68.) For the Catalyst 6509-NEB-A and the Catalyst 6509-V-E
Chapter 4
Removal and Replacement Procedures
Figure
Figure
4-69.)
4-70.)
OL-5781-08

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6500 series

Table of Contents