Cisco 6503 - Catalyst Firewall Security Sys Installation Manual page 185

Installation guide
Hide thumbs Also See for 6503 - Catalyst Firewall Security Sys:
Table of Contents

Advertisement

Chapter 3
Installing the Switch
Note
Position the GBIC transceiver in front of the socket opening and insert the GBIC transceiver into the
Step 5
socket until you feel the GBIC transceiver module connector snap into place in the socket connector.
Note
For optical GBIC transceivers, before removing the dust plugs and making any optical connections,
observe the following guidelines:
Always keep the protective dust plugs on the unplugged fiber-optic cable connectors and the
transceiver optical bores until you are ready to make a connection.
Always inspect and clean the SC connector end-faces just before making any connections.
Always grasp the SC connector housing to plug or unplug a fiber-optic cable.
Remove the dust plugs from the network interface cable SC connectors. Save the dust plugs for future
Step 6
use.
Inspect and clean the SC connector's fiber-optic end-faces. (Refer to
Step 7
Connectors" section on page
Remove the dust plugs from the GBIC transceiver optical bores.
Step 8
Immediately attach the network interface cable SC connector to the GBIC transceiver.
Step 9
To connect 1000BASE-T GBIC transceivers to a copper network, perform the following substeps:
Step 10
To comply with GR-1089 intrabuilding lightning immunity requirements, you must use grounded,
Caution
shielded, twisted-pair, Category 5 cabling.
a.
Insert the Category 5 network cable RJ-45 connector into the GBIC transceiver.
Note
Insert the other end of the network cable into an RJ-45 port on a 1000BASE-T-compatible target
b.
device.
Observe the port status LED:
Step 11
OL-5781-08
On some GBIC transceivers, the TX and RX marking might be replaced by arrowheads pointing
from the GBIC transceiver connector (transmit direction or TX) and toward the connector
(receive direction or RX).
B-38.)
When connecting to a 1000BASE-T-compatible server, workstation, or router, use four
twisted-pair, straight-through Category 5 cabling for the GBIC transceiver port. When
connecting to a 1000BASE-T-compatible switch or repeater, use four twisted-pair, crossover
Category 5 cabling.
The LED turns green when the GBIC transceiver and the target device have an established link.
The LED turns amber while the GBIC discovers the network topology and searches for loops.
This process takes about 30 seconds, and then the LED turns green.
If the LED is off, the target device might not be turned on, there might be a cable problem, or
there might be a problem with the adapter that is installed in the target device.
Attaching the Interface Cables
"Cleaning the Fiber-Optic
Catalyst 6500 Series Switches Installation Guide
3-65

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6500 series

Table of Contents