What Is Next; Optional Installation Kits - Cisco 6503 - Catalyst Firewall Security Sys Installation Manual

Installation guide
Hide thumbs Also See for 6503 - Catalyst Firewall Security Sys:
Table of Contents

Advertisement

Chapter 3
Installing the Switch

What is Next

After installing the chassis in its location, complete the installation process by following these
procedures:

Optional Installation Kits

An optional rubber feet installation kit is included in the accessory kit for the Catalyst 6509-E switch
chassis. This kit contains the parts necessary to install four non-slip rubber feet on the bottom of the
chassis allowing the chassis to placed on a shelf or a table. To install the rubber feet, go to
the Rubber Feet Kit" section on page
A center rack-mount kit for 23-inch, telco-style racks is available as an option for both the Catalyst 6509
and the Catalyst 6509-E switch chassis. The kit is not included in the accessory kits, but is available as
a separately orderable item (p/n WS-C6597=). Installation instructions are included with the kit.
OL-5781-08
Connecting the chassis to system ground. See
page
3-52.
Installing and connecting the power supplies to source power. Go to Chapter 4 for information on
how to install and cable power supplies.
Connecting the network interface cables to the supervisor engine and modules. This may involve
installing transceivers before you attach the network interface cables. See
Cables" section on page
3-61.
Powering-up the chassis and verifying the installation. See
section on page
3-84.
Installing a Catalyst 6509 or Catalyst 6509-E Switch Chassis
"Establishing the System Ground" section on
"Verifying Switch Chassis Installation"
3-50.
Catalyst 6500 Series Switches Installation Guide
"Attaching the Interface
"Installing
3-25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6500 series

Table of Contents