Installing a Catalyst 6513 or Catalyst 6513-E Switch Chassis
Figure 3-24
L-bracket
12 x 24
or
10 x 32
(10x)
What is Next
After installing the chassis in its location, complete the installation process by following these
procedures:
•
•
•
•
Catalyst 6500 Series Switches Installation Guide
3-46
Installing the Catalyst 6513 Switch Chassis in the Rack
WS-X6K-SUP2- 2GE
1
SUPERVISOR2
WS-X6K-SUP2- 2GE
2
SUPERVISOR2
3
4
5
WS-X6408
6
1
8 PORT GIGABIT ETHERNET
WS-X6408
7
1
8 PORT GIGABIT ETHERNET
WS-X6408
8
1
8 PORT GIGABIT ETHERNET
9
10
1
11
1
12
1
13
1
2
Cable guide
Connecting the chassis to system ground. See
page
3-52.
Installing and connecting the power supplies to source power. Go to Chapter 4 for information on
how to install and cable power supplies.
Connecting the network interface cables to the supervisor engine and modules. This may involve
installing transceivers before you attach the network interface cables. See
Cables" section on page
3-61.
Powering-up the chassis and verifying the installation. See
section on page
3-84.
Switch
Load
CONSOLE
100%
PORT
MODE
PORT 1
CONSOLE
PORT 2
PCMCIA
EJECT
1%
Switch
Load
CONSOLE
100%
PORT
MODE
PORT 1
CONSOLE
PORT 2
PCMCIA
EJECT
1%
2
3
4
5
6
7
8
2
3
4
5
6
7
8
2
3
4
5
6
7
8
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
"Establishing the System Ground" section on
Chapter 3
Installing the Switch
Shelf
bracket
"Attaching the Interface
"Verifying Switch Chassis Installation"
OL-5781-08