2. Click to select an Access Group, then click EDIT.
Figure 2-19 Figure 2-21 Editing an Access Group
3. Click + under Entity to expand a space and reveal the doors that belong to that
space.
4. Click to select a door, then select No schedule assigned from the Schedules.
52
MPA2C3 User Manual