NetCol5000-A050 In-row Air Cooled Smart Cooling
Product
User Manual
Figure 4-28 Positions of the needle valves
(1) Low-pressure needle valve (2) Discharge pipe needle
----End
4.4.2 Removing the Pallet
Procedure
Step 1 Use a 10# insulated torque socket wrench to remove the eight M6x16 screws
securing the fasteners to the cabinet, and use an 18# insulated torque socket
wrench to remove the four M12x35 screws securing the fasteners to the pallet, as
shown in
Issue 13 (2023-08-20)
Figure
4-29.
Copyright © Huawei Digital Power Technologies Co., Ltd.
valve
4 Installation
(3) Liquid pipe needle valve
73