Item
Power
distributio
n
Space Requirements
Issue 13 (2023-08-20)
Specifications
Leakage circuit breakers are not recommended for the primary
route. If a leakage circuit breaker is required by the customer or by
local regulations, use the residual current circuit breaker (RCCB)
that is not sensitive to the single-phase DC pulses and transient
current pulses.
Before installation, verify that the installation environment meets the
requirements and whether reconstruction is required for routing water pipes,
cables, and ventilation pipes.
Install the indoor unit according to the design drawing and reserve space for
maintenance. At least 1200 mm maintenance space must be reserved in front
of or at the rear of the indoor unit, and at least 600 mm maintenance space
must be reserved at the other end, as shown in
Figure 4-3 Maintenance space
(1) NetCol5000-A
Ensure that the equipment room provides good heat insulation, and the walls
and floor are dampproof.
Take measure to avoid damaging cabinet components and cables during
cabinet transportation.
To ensure good ventilation, check that the indoor unit is not placed in the
corner of a room or at the end of a long and narrow room.
Check that all doors and windows of the equipment room are closed to
reduce the workload of the smart cooling product during system operation.