Check Item
Pipes
Electric
verification
Low
temperature
component
(optional)

5.3 Checking the Water Cooling Module

Table 5-5 Installation checklist
Check Item
Rack
Pipes
Issue 13 (2023-08-20)
Expected Result
Pipes are secured and not damaged.
The needle valve cap has been
tightened.
Lay out the pipes properly, and cannot
destroy the building structure and
waterproof.
No cable is in contact with the copper
pipe.
Verify that the cables have been used
protective casing and the cable outlet
facing down.
Verify that the terminal position is
higher than the position of the
connecting cable.
Verify that the phase sequence of the
outdoor unit output cables is correct. If
the phase sequence is incorrect, the
outdoor fan will rotate reversely.
Waterproof connectors are tightened.
Apply sealing putty when the
waterproof connector on the outdoor
unit side faces upward.
Cables are securely tightened, and
measures have been taken to prevent
cables from sun exposure and water.
The low temperature component is
secured using bolts.
Expected Result
The rack is installed properly,
without any tilt.
Ports are connected correctly, and
all pipes are wrapped with thermal
insulation foam
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Installation Verification
Actual Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
Actual Result
□ Passed □ Failed
□ Passed □ Failed
134