Optional) Combining Units - Huawei FusionCol8000-C210 User Manual

In-room chilled water smart cooling product
Hide thumbs Also See for FusionCol8000-C210:
Table of Contents

Advertisement

FusionCol8000-C210 In-room Chilled Water Smart
Cooling Product
User Manual (2022, Netherland GS)
Prerequisites
● Before exhausting nitrogen, check whether the cooling system has good air
tightness. (Remove the bonnet from the exhaust valve and press the valve plug
to check whether there is a sound of air flow.)
● Open the exhaust valve of each heat exchanger to exhaust nitrogen onsite.
Context
Figure 4-10 Exhausting nitrogen
Before connecting chilled water pipes, exhaust all nitrogen in the pipes to avoid
personal injury.
Procedure
Step 1 Slowly open the exhaust valve to exhaust nitrogen.
Step 2 Fasten the exhaust valve when no air exhausts at the valve.
----End

4.3.4 (Optional) Combining Units

Procedure
Step 1 Combine units. Secure the connecting kits in the connection positions on the
display module side using screws, as shown in the following figure.
Issue 01 (2022-12-30)
NO TICE
D ANGER
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 System Installation
44

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusioncol8000-c210h4

Table of Contents